About us
Join us
extranet
Contact us
History
Where to find us
Production facilities
Human Resources
Quality
News
2012
INDELEC raised massive interest from INDIA customer on ELECRAMA 2012
INDELEC wishes its Clients and Partners a very successful new year
2011
ISO 9001 : 2008 certification
Successful first International Lightning Protection Symposium
PHIL CONSTRUCT 2011 in Manila PHILIPPINES from November 9 -12, 2011 - Booth 620
Iran Telecom 2011 Tehran Nov. 15-18, 2011
First International Lightning Protection Symposium
ELECTRIC INDONESIA 2011 exhibition
INDELEC hits again the headlines
“ESE national standards are in force and this is in line with the CEN-CENELEC Internal Regulations”
The devastating effects of lightning
New Technical Guidelines for Cranes Lightning Protection System
INDELEC exhibits on ELECTRIC INDONESIA 2011
SIEL Tunis 2011
EXPOBUILDING March 22-25, 2011 Building materials, equipment and technologies
2010
INDELEC introduced its products and services at ENCON EXPO 2010 - Vietnam
INDELEC donates to the future Danang Neonatal Intensive Care & High Dependancy Unit
New Technical Guidelines for Heritage Buildings Lightning Protection System design
Prevectron® new test reports
Lightning event counter new testing requirements
New Technical Guidelines for Airport Lightning Protection System design
International Lightning Protection Association
Lightning Protection of Photovoltaics installations
Lightning Protection goes Green
New Technical Guidelines for High Rise Buildings Lightning Protection System design.
New Technical Guidelines for Pre Engineered Steel Structures factories Lightning Protection System design
Technical Seminar on Earthing termination design and calculation
ELECRAMA 2010 - Mumbai - INDIA
Technical Guidelines for Golf Courses Lightning Warning and Protection Systems
2009
Successful launch of the new Stormonitor
AMPER 2009 Czech Republic
2008
A new Prevectron installation on a high rise building !
New self testing Prevectron S 6.60 T
INDELEC on ELECRAMA exhibition
2007
INDELEC on POLLUTEC exhibition
New Indelec website
The Lightning Phenomenon
Lightning knowledge
Lightning damages
Lightning protection
FAQ
Lightning mastered
Prevectron 2
Installation
Indirect protection
Overvoltage
Choice of SPD and step-protection installation
Surge Protection Cabinets
Glossary
Resources
Books
Video
Links
Download
Audit
Survey
Installation
LPS Control and Maintenance
Tests in laboratory
Tests in Situ
Results
Africa
America
Asia / Oceania
Europa
Middle-East
Offres d'emploi
Candidature spontanée
Contact us
Forward
Print
Planning a project
You are here :
Home
>
Planning a project
Name and address of customer
Name* :
Last Name* :
Address :
Zip code :
City :
Tel.* :
Fax :
Email* :
Name and address of the structure to be protected
Name :
Address :
Zip code :
City :
Definition of the structure
Building usage :
Type of products stored/manufactured in the building :
Presence of antennae on the roof ?
oui
non
Presence of metallic structures on the roof ?
oui
non
Presence of external gas pipes ?
oui
non
Presence of electrical cables on the facade ?
oui
non
Is a specific electrical equipments surge protection survey required ?
oui
non
Nature of the ground for installation of the LPS earthing system ?
Presence of asphalt or concrete (at the location of the future earthing system) ?
Presence of other earthing pits ?
Presence of underground earth loop around the building ?
oui
non
Presence of earth rods ?
oui
non
Telecom lines ?
oui
non
Data lines ?
oui
non
Location of the structure
Structure located in a place where there are other strucures or trees of identical or greater height.
Structure surrounded by lower structures
Isolated structure, no other structures closer than a distance of 3H.
Isolated structure at the top of a hill.
Occupation of the building
Unoccupied
Commonly occupied
Difficult evacuation (risk of panic)
Structure contents
No value - No fire risk
Common value - Low fire risk
High value - Increased fire risk
Exceptional value - Very great risk of fire - Explosives
Consequences of a lightning strike
Interruptible services - No environmental consequences
Non interruptible services - No environmental consequences
Environmental consequences
Remarks
Attachements
Attachements and send :
clic on picture to close it
fermer [ X ]